150kVA-5.3V/6.1V/7.3V-5 Transformer of Spot Welding Machine

Product Details
Customization: Available
Application: Power
Phase: Single
Still deciding? Get samples of US$ 2402/pcs
Order Sample
Shipping & Policy
Shipping Cost: Contact the supplier about freight and estimated delivery time.
Payment Methods:
visa mastercard discover JCB diners club american express T/T
PIX SPEI OXXO PSE OZOW
  Support payments in USD
Secure payments: Every payment you make on Made-in-China.com is protected by the platform.
Refund policy: Claim a refund if your order doesn't ship, is missing, or arrives with product issues.
Secured Trading Service
Diamond Member Since 2010

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Number of Employees
73
Year of Establishment
2008-09-25
  • 150kVA-5.3V/6.1V/7.3V-5 Transformer of Spot Welding Machine
  • 150kVA-5.3V/6.1V/7.3V-5 Transformer of Spot Welding Machine
  • 150kVA-5.3V/6.1V/7.3V-5 Transformer of Spot Welding Machine
  • 150kVA-5.3V/6.1V/7.3V-5 Transformer of Spot Welding Machine
  • 150kVA-5.3V/6.1V/7.3V-5 Transformer of Spot Welding Machine
  • 150kVA-5.3V/6.1V/7.3V-5 Transformer of Spot Welding Machine
Find Similar Products

Basic Info.

Model NO.
150KVA-5.3V/6.1V/7.3V-5
Core
Core-type Transformer
Cooling Method
Water Cooling
Winding Type
Two-winding Transformer
Certification
CCC
Usage
Single-phase Transformer
Frequency Characteristics
Power Frequency
Shape of Core
Oval Type
Brand
Jaxo
Consumer of Cooling Water Q
8L/Min
Insulation Class
F
Proctive Grade
II
Weight
210kg
Transport Package
Wooden Case
Specification
150KVA-5.3V/6.1V/7.3V-5
Trademark
JAXO
Origin
Zhejiang, China
Production Capacity
100PCS/Month

Packaging & Delivery

Package Size
49.00cm * 28.00cm * 47.00cm
Package Gross Weight
215.000kg

Product Description

Product Information

Product parameters
Model 150KVA-5.3V/6.1V/7.3V-5
 Power source(U1) 380V
Secondary unload voltage(U20) 5.3V/6.1V/7.3V
Power at 10% duty cycle(S10) 235KVA
Power at 20% duty cycle(S20) 150KVA
Power at 100% duty cycle(SP) 106KVA
100% load current output(IP) 20000A
Consumer of cooling water Q 8L/min
Insulation class F
Proctection  grade II
Weight 210KG

150kVA-5.3V/6.1V/7.3V-5 Transformer of Spot Welding Machine
Inventory
150kVA-5.3V/6.1V/7.3V-5 Transformer of Spot Welding Machine


Packing
150kVA-5.3V/6.1V/7.3V-5 Transformer of Spot Welding Machine
150kVA-5.3V/6.1V/7.3V-5 Transformer of Spot Welding Machine
About us
150kVA-5.3V/6.1V/7.3V-5 Transformer of Spot Welding Machine

150kVA-5.3V/6.1V/7.3V-5 Transformer of Spot Welding Machine
Development history

In 1992, our company was established as the "Shiya Jiaxiao Electrical maintenance department" Our founder was only 19 years old.

In 1993, the first "spot welder" was introduced in the maintenance department between ten and twenty square meters, from which it formed a tie-in with other welding machines.

In 1995, the first barrel of gold was produced in the insulation cup industry and our seam welder was introduced.

In 2003, the factory moved to the Gushan Industrial Base. The facility covered 2,000 square meters and a number of additional management and technical personnel were hired as we grew from a family workshop to a full-fledged factory.

In 2007, an information management system was introduced to lay the foundation for operational standardization that would streamline work and create a data-oriented management system.

In 2008, the "Yongkang Jiaxiao Welding Automation Equipment Co., Ltd." was officially named as we entered a stage of standardized operational management.

In 2010, we formulated a medium to long-term development plan to define the mission, vision, and values of our production enterprise.

In 2011, we established our automation business unit to produce a variety of stamping production lines and lay the foundation for automated welding machinery that would grow to a large catalog of products.

In 2013, we participated in the Canton Fair, effectively breaking into the international marketplace.

In 2014, we moved our base to the Chenxi New Area, this allowed us to expand production and meet requirements.

In 2016, we partnered with an Italian design company to develop three series of welding machines. This resulted in the combination of our 25 years of manufacturing experience with new ideas from an outside source.

In 2017, we integrated a new line of services to provide customers with resistance welding products, special equipment, welding core components, cost-effective transformers, cylinder heads, copper parts and cloud controllers. The performance indicators of these products (power factor, temperature rise value) far exceeded the national standards.

 

1. Where is your factory located?

Our factory is located in Yongkang city, Zhejiang Province of China. The nearest airport is Xiaoshan Internation airport or Shanghai Pudong International airport. We can pick you up from Yongkang city.

 

2. About Jiaxiao company.

(1). Over 30 years of OEM&ODM experience on transformer.

(2).  Excellent service on before sale, on sale and after sale.

(3). Scientific and technological enterprise in Zhejiang.

(4). National high-tech enterprise.

(5). Has dozens of national patents.

 

3. About Package.

We have self-operated products and can also receive OEM\ODM. If customers have their own product packaging design solutions for products, they can provide us with solutions. We strictly follow your company's product packaging design packaging products.
(1): Product inner packaging: use high-quality bubble wrap to pack the product. Prevent the product from being squeezed by external forces during handling and transportation.
(2): Special parts packaging: Count the parts before packaging, put them in a plastic bag, and seal them up. Prevent parts from being lost.
(3): Product outer packaging: The outer packaging is usually packaged in a wooden box. (If you have special design requirements for external packaging, please give us a detailed design plan.)

 

4. MOQ

1 sets can be accepted as well.

 

5. Shipping

 Land transportation, Air transportation, the express transport and so on.
Large orders can be shipped by sea.

 

6. Delivery

After service: Within 5 years,if the transformer has question,and if the buyer sends it back,the seller will send new one to buyer,all the transportation fees will be paid by buyer. If won't send it back,the buyer will return 30% of the payment to seller.And if the buyer requires new one,the seller  will charge 70% of the payment and send new one to buyer.    

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now